- DETAILS

Willergasse 38
1230 Vienna

Object:

Residential complex with 4 floors, access through a central staircase and elevator (KG to 2nd floor). In the basement there is an underground car park with access via Willergasse with 6 parking spaces. There are also technical rooms, a stroller storage room, parking spaces for bicycles and storage facilities in the basement. The garbage room is on the ground floor. The children's playground is located in the open air area. The apartments are located on the ground floor, 1st floor, 1st attic and the 2nd attic. Each unit is assigned a terrace or balcony. The ground floor apartments also have a garden area available.

Furnishing:

Walls: Load-bearing outer walls in reinforced concrete and brick masonry. Blanket: In-situ concrete ceiling or prefabricated ceiling including reinforcement according to static requirements. Staircase: In-situ concrete stairs or prefabricated stairs from the ground floor to the 2nd attic floor. Railings with metal bars and handrails, painted. Lift system: 8-person elevator with emergency call and monitoring system, handicapped accessible. Cabin with mirror, overhead lighting and handrail on the side wall. Windows and sun protection: Plastic-aluminum windows with triple thermal insulation glazing Sun protection on the windows and French doors / lift and slide doors. External flush-mounted roller shutter, electric, switch actuation. Apartment entrance door Wooden entrance door, color white, in a painted steel frame, burglary resistance class WK II or RC 2. House entrance door Thermally separated aluminum construction, Schüco or equivalent Balcony and terrace construction made of reinforced concrete.

- More Details -

Acquisition, ownership, renovation, development, exploitation and rental of real estate as well as real estate trading.

- Construction Phases -

Until the turnkey property has been accepted, the developer is also the builder. He takes over the entire organization. As a buyer, you can still express your individual wishes and follow the construction progress on the construction site.

Phase1

Phase2

Phase3